Our Projects

Ongoing Projects

Lulu Mall - Perinthalmanna

Ongoing

Progress 60%

Ginger Hotel

Ongoing

Progress 60%

The Charter School

Ongoing

Progress 60%

Revamping of CIASL Campus

Ongoing

Progress 60%

Payyanur TalukHospital

Ongoing

Progress 60%

KMRL-WATER METRO TERMINAL at MATTANCHERRY

Ongoing

Progress 60%

KMRL

Ongoing

Progress 60%

BMH Hospital

Ongoing

Progress 60%
Featured Projects

Project Completed

Lulu Mall Kottayam

Ernakulam Market

Cochin International Airport Limited(CIAL)

Nippon Toyota

Aster Tower 4

  • 1.10 Lakhs sq.ft. Hospital Building
  • G+6 Floors
  • 8 Months Project duration

Aster Medicity

  • 5,75,000 sq.ft.
  • LB+G+6 Floors
  • 2 Towers
  • 24 Months Duration
  • 8 Acers of Land Area

Rajagiri Hospital

  • 5,00,000 sq.ft.
  • LB+G+7 Floors
  • 18 Months Duration
  • 12 Acers of Land Area

Al Abeer Edu City

  • Hospital& Academic Block
  • 6 Lakh Sqft|2 Lakh Sqft
  • B+G+8 Floors|G+2 Floors
  • Duration 12 Months
  • 90 Acers of Land Area

ABAD Builders

  • BLUECHIP, Kakkanad
    2 Towers–19 Floors
  • AQUABREEZE, Aluva
    10 Floors
  • CHANCELLOR,Kakkanad
    G+20Floors
  • OASIS, Edappally
    G+1 9 Floors
  • SPRING FIELD ,Aluva
    30 Nos Villas Project

CIAL

  • Link Bridge
  • 6 Nos
  • 100+MT Structural Steel
  • 6 Months duration

Gold Tower

  • 4.85 Lakh Sq.ft. Apartment
  • 2B+G+22 Floors
  • 18 Months Duration Project
  • 1.57 Acers of Land Area

Lulu Group

Corporate Tower Indian Head Office

  • 1,10,000 sq.ft
  • G+10 Floors
  • 18 Months Duration
  • 2.25 Acers of Land Area

DMRC | KOCHI METRO

16 Stations Entry Exit Buildings

  • Aluva LHS
  • Companypady LHS
  • Muttom RHS& LHS
  • Kalamsserry LHS
  • CUSAT LHS
  • Pathadipalam LHS& RHS
  • Edappally LHS& RHS
  • Changapuzha LHS
  • Triangular RHS
  • Palarivattom LHS& RHS
  • Vytila Station

DMRC | KOCHI METRO

23 km of BLT Track Work from Aluva to Petta

General Hospital Ernakulam

  • Architectural Finishes
  • 85,000 sq.ft.built up area
  • G+8 Floors
  • 18 Months Duration

POTHYS Kaloor

  • 3.5 Lakh Sq.Ft.
  • 3B+G+8 Stories
  • 24 Months Project
  • 1.5 Acres Land
  • 400+MT Structural Steel Work
  • 12+m Deep Excavation.
  • 7,500m Piling

Pothys Swarna Mahal

  • 1 Lakh Sq.Ft.
  • 2B+G+8 Stories
  • 12 Months Project